Default Re: Huawei CDMA E BTS Max Power??? HI I think it can be more than 20W because the RF board support MAX 60W. The 3rd Global CDMA Operation and Development Forum, themed. To illustrate this further, we can note that Huawei BTSCE power With Huawei latest CDMA BTS products, based upon the physical network. indoor type) and BTSAC (for outdoor type) are The complete series of CDMA BTSs, and relevant Thus, for the same traffic in a sector, a Huawei BTS.

Author: Meztigrel Yosida
Country: Liechtenstein
Language: English (Spanish)
Genre: Science
Published (Last): 19 January 2010
Pages: 468
PDF File Size: 2.44 Mb
ePub File Size: 12.72 Mb
ISBN: 496-7-68240-692-8
Downloads: 18153
Price: Free* [*Free Regsitration Required]
Uploader: Vogul

Outline Figure shows the outline of A series support.

Leveling the lower support See section 2. Fix them onto the units. Lead the bolts through the lower support.

CDMA grows greener – Huawei Publications

Watch out for the sharp edges on the RF fan panel during the installation of RF cables lest it hurt your fingers. That is, 1 m 39 in. To remove cabinet doors, do it in a reverse order. Figure Installing a board 2 Tighten the screws clockwise on the front panel, as shown in Figure Installing the Lower Support To install the lower support, proceed as follows: This buawei introduces how to install the power module and what to pay attention during the installation.

  JAY OREAR PHYSICS PDF

Installation Method You need to prepare the U-bar support on the site. Do not put the wooden case upside down. Page of 93 Go. The following items must be checked The BTS in the multi-channel mode does not support the power synthesis function.

Huawei BTS3606 Installation Manual

To avoid damaging equipment inside, do not apply too much force. Indoor centralized rack icr dual-mode base station pages. Chapter 4 Installing Cables introduces the categories of cables installed on site, cable distribution methods, and procedures of connecting various cables in BTS cabinet.

Connect the two probes to the paint-free place of the base and the expansion bolt. Figure shows RF cable connections, indicated by blue lines. The power cable and the grounding cable are routed straight and bundled neatly.

Align the holes on the antistatic floor with the connecting holes of the support. Page 14 – Power Supply Conditions of the Equipment The depth of the hole must range from 52 mm 2 in. Diagonally fasten them to a 45 N-m in-lbas shown in Figure The last section also explains how to install cabinet assemblies on the cement floor without sufficient bearing capacity. Insert the boards according to the names on the relevant nameplates to avoid any mistake.

  DARK TIDE STEPHEN PULEO PDF

HUAWEI BTS INSTALLATION MANUAL Pdf Download.

When positioning the cabinet, try to avoid the interference between the installation supports and the antistatic floor framework. Connect the other end to the DB9 socket of the power backplane.

When handling the cabinet, hold on the solid places such as the upper cable rack or bone frame. Make sure the support is level and then cross-fasten the bolts of the lower support to 45 N-m in-lb with a torque wrench.

Fasten the three bolt sets in the following order: Route the alarm cables coming in from the other side of the enclosure through the cabling holes on both sides of the 8-E1 module and then to the respective slots. Procedure To prepare power cables, proceed as hkawei It is divided into six chapters: They are used for the convenience of installation description.

Start Position the cabinet Remov e the